Early access · UK landscape, tree and land contractors

Every job on the land, on the record.

Ledgerow helps contractors quote from the map, run recurring work and prove it was done, from a garden hedge to a 30-year biodiversity net gain plan.

Built in Suffolk. Opening to a small group of contractors first.

H1 · hedge · 86 mT3 · oak · 17 m
Quote · front garden
Hedge H1, 86 m × 2.4 m high206 m² face
Oak T3, crown reduction17 m (LiDAR)
Tree preservation order nearby: consent check needed
Bird nesting seasonBook from 1 Sep

How it works

Quote it. Schedule it. Prove it.

Quote from the map

Clients draw their own garden or site on satellite imagery, so you can scope the job without a wasted visit.

  • Tree and hedge heights from Environment Agency LiDAR
  • Tree preservation orders and conservation areas flagged before you price
  • Bird nesting season built into the quote

Run the recurring work

Turn one-off jobs into maintenance contracts, with schedules that know the seasons.

  • Recurring jobs with seasonal work windows
  • A field app for crews that works without signal
  • Price per job, per m², per metre or by the hour

Prove it was done

Every visit leaves evidence your clients can rely on, now and years from now.

  • Dated, location-stamped photos
  • Fixed-point photos that line up year after year
  • Crew notes and issues flagged on site

Who it’s for

Made for the people who do the work.

Landscape contractors

Quote faster and win the maintenance contract that follows.

Tree surgeons

Heights, constraints and consent checks before you set foot on site.

Agricultural contractors

Hedge-cutting priced by the metre or the hour, with evidence for scheme claims.

Estates and management companies

One record of every site, whoever does the work.

Biodiversity net gain

Thirty years of habitat work, delivered and evidenced.

New developments must maintain their biodiversity gains for at least 30 years. Ledgerow turns the habitat management plan into scheduled jobs, and the jobs into the evidence councils ask for.

  1. Upload the plan

    Prescriptions, timings and risks become a schedule.

  2. Deliver the works

    Creation, enhancement and aftercare, booked by season.

  3. Capture the evidence

    Photos, notes and as-built measurements from the field.

  4. Sign off

    Ecologists review and sign off completed work.

  5. Report

    Activity registers and monitoring reports in Natural England's template formats.

Small sites too. Check whether BNG applies, and which metric, from the boundary you draw.

Works alongside your ecologist. Import existing habitat maps and keep their sign-off in the record.